Founded in 1995, Geoizol now employs over 1000 people
Distribution Of Work Types In Overall Operations
-
Waterproofing
-
General construction works
-
Grouting/Injection
-
Hydraulic Engineering
-
Design
-
Bridge Construction
-
Titan piles installation
-
Bored piling
- (Cast-in-situ) bored piling
Major Works
Underground construction (underground parking facilities)
Works completed in 2007:
1.Five-levelled underground parking in Komendantskaya Square, with depth of 19.5 m, diameter of 70 m, commissioned by Adamant Company
2.Transport tunnel under the Neva River between Piskaryovsky Prospekt and Orlovskaya Street, point A , left bank. Retaining structure construction (diaphragm wall). The Client: St.Petersburg Vodokanal State Unitary Enterprise Volume of works carried out: Length – 163.4 m Depth of bays – 32 m Excavation depth – 13 m (11 m and 16 m) Wall thickness – 1 m
3.Buildings 2-4 Zoologichesky Pereulok, sections A, B. Structures featuring an underground parking. Construction of retaining diaphragm wall. The Client: Vozrozhdenie-St.Petersburg construction company Scope of executed works: Length of wall – 50 m Depth of bay – 30 m Excavation depth – 9.9 m Wall thickness – 0.8 m
4.Sites: New Holland Okhta Centre
Trial pit execution at New Holland project.Retaining structure construction (diaphragm wall). The Client: Soletanche Stroy construction company Scope of works: 3 barrettes: two - 3.3m õ 1m, one - 604m õ 1m. Depth – 30 m Okhta Centre Construction and testing of barrettes Scope of executed works: 3 barrettes: 1: 7.7m ´ 1m, 2: 3.3m ´ 1m Depth – 65 m 1200 mm diameter piles Depth – 55 m
Bored piled foundations; diameter of piles: 150-350 mm
Hutte bored piling rigs capable of constructing 150-350 mm diameter piles are instrumental in underpinning works, as well as in construction of piled foundations using pile diameters of 200-350 mm with rigid tube reinforcement and Ichebeck micro-piles. Productivity - up to 250 l.m. of piles per working shift. Currently in the possession of the company there are 6 rigs: HBR-605 (diesel), HBR-609 and HBR-202,203 (diesel and electric).
Construction of bored (cast-in-situ) 400-1500 mm diameter piles for use in both new development and reconstruction projects
Franki rigs are capable of constructing screw piles with up to 820 mm diameter with output of up to 10-12 piles per working shift (100-200 l.m. of piles).
Currently in the possession of the company there are 5 Franki bored piling rigs BT50, 3 Fundex rigs and 5 Casagrande rigs .
Widely used methods:
|